INPUTS: [I1]Rud Weight(+100%) Source(Rud)
MIXES: CH1 [I1]Rud Weight(+100%) Expo(-50%)
SERVOS: CH1 min=-90 max=90
This program works correctly if the trim(RUD) = 0. IF trim>0 or trim<0 the program does not work correctly.
It's possible to model the crash.
Search found 21 matches
- Tue Aug 11, 2015 9:18 am
- Forum: openTx
- Topic: negativ expo
- Replies: 2
- Views: 2092
- Thu Jun 05, 2014 4:13 am
- Forum: openTx
- Topic: Completion of mixers.
- Replies: 2
- Views: 2021
Re: Completion of mixers.
The question "how to adjust the flaps from THR?" often asked in all forums.
Do it now without curves is not possible! This should do the mixer. The weight must be adjusted deviation, Offset set the initial position.
I do not understand why this is not done.
Do it now without curves is not possible! This should do the mixer. The weight must be adjusted deviation, Offset set the initial position.
I do not understand why this is not done.
- Mon Jun 02, 2014 6:59 am
- Forum: openTx
- Topic: Completion of mixers.
- Replies: 2
- Views: 2021
Completion of mixers.
Now mixer function graphically looks as is drawn on Fig.1. It is very convenient for surfaces which deviate symmetrically the central situation. Such function is suitable for ELE, AIL and RUD sticks. These flow down in a starting position are in the center. On graphics it is shown by a point "0...
- Mon Nov 04, 2013 11:21 am
- Forum: openTx
- Topic: not work cf1
- Replies: 3
- Views: 3003
Re: not work cf1
It isn't correct.
In calculations real value in the channel has to be used.
In calculations real value in the channel has to be used.
- Sat Nov 02, 2013 3:15 pm
- Forum: openTx
- Topic: not work cf1
- Replies: 3
- Views: 3003
not work cf1
Correct a bug please.
At installation:
CH3 (100%)Thr
CF1 ON SafetyCH03 -100 ON
CS1 CH03 > -75
Always there will be CH3 =-100, and the CS1 switch continues to work from stick THR.
At installation:
CH3 (100%)Thr
CF1 ON SafetyCH03 -100 ON
CS1 CH03 > -75
Always there will be CH3 =-100, and the CS1 switch continues to work from stick THR.
- Sat Nov 02, 2013 2:51 pm
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
opentx-r2834
Ok.
Ok.
- Sat Nov 02, 2013 11:01 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
Correct a bug please.
At installation:
CH3 (100%)Thr
CF1 ON Safety CH03 - 100 ON
CS1 CH03 > -75
Always there will be CH3 =-100, and the CS1 switch continues to work from stick THR.
At installation:
CH3 (100%)Thr
CF1 ON Safety CH03 - 100 ON
CS1 CH03 > -75
Always there will be CH3 =-100, and the CS1 switch continues to work from stick THR.
- Mon Jul 29, 2013 3:42 pm
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
Control I made in EEPE of 801 versions.
- Mon Jul 29, 2013 2:16 pm
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
The RETA and RTEA modes for GVAR are similarly mixed.
In a mode mode2 I put:
GVAR1 = Etrm thus a variable changes from a trimmer of THR.
In a mode mode2 I put:
GVAR1 = Etrm thus a variable changes from a trimmer of THR.
- Wed Jul 24, 2013 1:15 am
- Forum: eePe
- Topic: Improvements for future EEPE versions.
- Replies: 3
- Views: 3806
Re: Improvements for future EEPE versions.
It isn't so convenient to press this button after each operation with model.
It is more convenient to place number of free bytes in a line of "general settings" on the right.
It is more convenient to place number of free bytes in a line of "general settings" on the right.
- Tue Jul 23, 2013 2:30 am
- Forum: eePe
- Topic: Improvements for future EEPE versions.
- Replies: 3
- Views: 3806
Improvements for future EEPE versions.
At assembly of the project from models places it aren't visible how many will take in memory of the transmitter.
In the screen of the project it is desirable to put the counter of free/busy memory, as in the transmitter.
In the screen of the project it is desirable to put the counter of free/busy memory, as in the transmitter.
- Mon Jul 22, 2013 2:29 pm
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
Wishes according to the "eepe" program can be written here?
- Fri Jul 19, 2013 9:20 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
In the "eepe" program it will be convenient to unite screens "trimmers" and "modes" in one. It becomes simpler to adjust a trimmer.
- Fri Jul 19, 2013 9:06 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
Thanks. Everything works as it is necessary.
Now it is safe to expose a subtrimmer in 10.
It is possible even to increase range till 15-20.
Now it is safe to expose a subtrimmer in 10.
It is possible even to increase range till 15-20.
- Wed Jul 17, 2013 7:36 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
In a manual it is written:
"The limits act both as gains and as absolute limits. The servo will not go beyond the limits you
set here."
Autolimits have to conform to this requirement.
"The limits act both as gains and as absolute limits. The servo will not go beyond the limits you
set here."
Autolimits have to conform to this requirement.
- Tue Jul 16, 2013 12:03 pm
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
automatically added (internally, not on the screen) Mike. The such shouldn't be categorically. The program has to be simple. All indications have to be obvious to people. I put: autolimits=10 subtrim=10, min =-100 max = + 100. In the output channel I received values: from-90 to +110. Value +110 thi...
- Tue Jul 16, 2013 3:03 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
The main stage of control of model is installation of limits and the central point. At change of the central point always it is necessary to recalculate values of limits for the size of a subtrimmer. This procedure has to be carried out automatically. It is in many known transmitters. For example we...
- Tue Jul 16, 2013 1:46 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
In the "modes" screen of the logician of work remains correct. It isn't necessary to remake memory structure.
It is enough to change only letters:
RETA for mode1
RTEA for mode2
It is enough to change only letters:
RETA for mode1
RTEA for mode2
- Mon Jul 15, 2013 3:21 pm
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
Transition on new version it is necessary to combine with transition on new processor mega128 or better.
Then effect will be maximum.
As soon as force the producers to release the new charge?
Then effect will be maximum.
As soon as force the producers to release the new charge?
- Mon Jul 15, 2013 9:29 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
it is adjusted
FM0 RETA
FM1 ID1 R0TA
FM2 ID2 R0TA
FM3 --- 0000
FM4 --- 0000
Channel "R" has 3 trimmers
Channel "E" has 3 trimmers ???
Channel "T" has 1 trimmers ???
Channel "A" has 3 trimmers
FM0 RETA
FM1 ID1 R0TA
FM2 ID2 R0TA
FM3 --- 0000
FM4 --- 0000
Channel "R" has 3 trimmers
Channel "E" has 3 trimmers ???
Channel "T" has 1 trimmers ???
Channel "A" has 3 trimmers
- Mon Jul 15, 2013 4:34 am
- Forum: er9x
- Topic: er9x development
- Replies: 3179
- Views: 1451528
Re: er9x development
BAG in ER9X and EEPE.
For equipment with mode2 on screen "modes" is mixed up trimmer E and T.
Installation made for "E" work for channel "T".
For equipment with mode2 on screen "modes" is mixed up trimmer E and T.
Installation made for "E" work for channel "T".